Skip to Content
  • Valitse kieli Suomi
  • Välj språket Svenska
  • Select language English
Finnish Safety and Chemicals Agency (Tukes)
Search page
  • Frontpage
  • Consumers
  • Chemicals
  • Electricity
  • Products and services
  • Industry
  • Online services
  • About us
  • Contact Details
  • Frontpage
  • Consumers
  • Chemicals
  • Electricity
  • Products and services
  • Industry
  • Online services
  • About us
  • Contact Details

Prior consultation on a planned project or change can be arranged, or the project can be presented to Tukes after the application has been submitted.

A presentation and a prior consultation are recommended, as they will allow the processing officer at Tukes to get a more accurate picture of the scope and risks of the project and to provide information to the operator on required clarifications.

Other authorities (e.g. the rescue department, the Centre for Economic Development, Transport and the Environment, the Regional State Administrative Agency and the municipality) may also be invited to the prior consultation.

The operator may request consultation on the changes from the supervisor in charge (the inspector who carries out the periodic inspections). In the case of a new site, consultation requests should be addressed to the Head of the Industrial Processes Unit.

Online meetings (e.g. Teams) are preferred for project presentations and consultations.

The permit application or change notification should be submitted to Tukes via the online service. The use of the online service requires appropriate authorisation from the operator’s representative. See the required level of authorisation.

See instructions on the use of the online service and the content of the application (pdf, in Finnish).

An application completed in accordance with the instructions will speed up the processing of the matter. A list of chemicals for an application or change notification must be prepared in the KemiDigi system. There are instructions in KemiDigi on how to use the lists of chemicals.

Describe the main content of the application in the fields provided. You may include references to attachments as necessary, but each field must contain a description of the matter in such a way that the reader will understand the matter even without the attachment. More detailed instructions for each field can be viewed by clicking the question mark symbol. Only enter in the application information that is public. If it is necessary to provide information classified as confidential, use attachments. If an attachment contains confidential information, add the word LUOTTAMUKSELLINEN to the name of the file. 

There must be grounds for the confidentiality of information in accordance with the Act on the Openness of Government Activities (621/1999). Confidential information includes but is not limited to trade secrets and documents containing detailed security arrangements. 

The received application or notification will be assigned a register number and a processing officer.

Tukes may request additional information or a supplement from the operator at any stage of the processing of the permit application or change notification.

It may be necessary to supplement the application even before the consultation or requests for comment.

Tukes will send requests for additional information and supplements to the operator via the online service. The contact person for the application will be alerted by email.

Each request for further information or a supplement will include a time limit by which the operator must submit their reply. Tukes will continue the processing of the matter after having received the additional information/supplement.

Applications for permits for new installations and major changes (change permits) are announced by means of a public notice. 

The purpose of the hearing is to give residents, communities and stakeholders in the vicinity of the facility the opportunity to comment on the application. 

The public notice and public application documents will be published on the Tukes website. Information on the public notice of the application will be published in the local newspaper and on the municipality’s website. 

The public notice and the application documents will be kept available for at least 30 days. 

If necessary, Tukes will request the operator’s response to any complaints and opinions received. Requests for reply will be submitted via the online service.

Tukes will request comments on both permit applications and change notifications. 

Comments may be requested from parties such as the rescue department, the Regional State Administrative Agency (occupational safety and health branch), the Centre for Economic Development, Transport and the Environment (environmental protection branch), the municipality and the police. 

Where appropriate, the operator will be asked to respond to the comments received. The request for a reply will be submitted via the online service. 

The procedure for obtaining comments typically takes approximately 30 days. 

The processing officer will prepare the decision, taking into account the issues raised during the processing of the application or change notification. 

Further information from the operator may be requested also during the preparation of the decision. 

The decision may contain conditions to be complied with by the operator. 
Each decision is appointed a rapporteur and a deciding official. The processing officer acts as the rapporteur. Depending on the scope of the matter, the decision will be made by the director of the department, the unit head or an experienced senior adviser. 

Decisions on both permit applications and change notifications will be delivered to the operator via the online service. An email about the decision will be sent to the operator. 

Decisions on permit applications (permit decisions) will also be sent to the operator by post with a certificate of service. 

The decision will also be submitted for information to other authorities and to those who have issued a complaint or an opinion.

The processing is subject to a fee in accordance with the Tukes price list.

If a public notice regarding the application was issued, one will also be issued for the decision. 

Public notices on decisions are published on the Tukes website. 

The parties will have the opportunity to appeal the decision to the Administrative Court during the period for hearing. 

The decision will become final at the end of the period for hearing. 

The period for hearing is 30 days from the service of the decision. The date of service is determined in the appeal instructions (enclosed with the decision).

The commissioning of new facilities and significant changes (change permits) requires a commissioning inspection by Tukes.

The operator must request for the commissioning inspection from Tukes in good time before the planned commissioning. Permitted operations are not to be started prior to the commissioning inspection.

An invitation to the commissioning inspection will be delivered via the online service. The invitation will contain preliminary questions to be answered by the operator by the given date.

The invitation will also be sent to other authorities (e.g. the rescue department, the occupational safety and health authority, and the environmental authority). The other authorities will inform Tukes and the operator whether they will attend the inspection.

Answering the preliminary questions requires the operator to have the appropriate authority for electronic services. Please note that different types of authorisation are required for permit applications and inspections.

During a commissioning inspection, the operator demonstrates that they are compliant with the application and the terms of the decision in terms of the technical safety of the facility, safety management systems and policies. 

The commissioning inspection consists of a document review and a site visit. 

Documents to be reviewed during the commissioning inspection include but are not limited to tank records and piping documentation, test documents related to the locking and alarms of the automation system, inspection protocols for the commissioning and verification of electrical installations, inspection protocols for safety automation systems, operating and maintenance manuals, an internal rescue plan and a major accident prevention policy document.

Depending on the scope of the facility or change, the commissioning inspection can take anything from a few hours to a full working day.

On the basis of the operator’s answers to the preliminary questions and the matters dealt with during the inspection, Tukes will prepare an inspection protocol and a decision.

On the basis of the inspection, measures may be required to ensure safety before the facility or change is commissioned.

The inspection protocol and the decision will be delivered to the operator via the online service. An email about the decision will be sent to the operator.

If deficiencies that require action before commissioning were detected during the inspection, they will have to be resolved by the operator through the online service. A deadline will be set for these tasks. 

The operator’s replies regarding the deficiencies will be processed by Tukes within 14 days of receipt. 

On the basis of the replies, the deficiencies will be deemed to have been remedied or additional requirements will be imposed.

The operator will receive a notification via the online service when the matter has been closed.

Share on Facebook Share on Twitter Share on LinkedIn | Print Share via Email

Finnish Safety and Chemicals Agency (Tukes)

kirjaamo (at) tukes.fi (Registrar's Office)
+358 29 5052 000 (switchboard)

 

SHORTCUTS

Contact details
E-invoices
Feedback
Data protection
About website
Accessibility statement

Youtube: Tukesinfo Instagram: Tukesinfo
Facebook: Tukes Twitter: Tukes Linkedin: Tukes

  • Frontpage
  • Consumers
    • Household chemicals
      • Biocides
      • Disinfectants
    • Household and garden pests
      • Rodenticides
      • Insecticides and insect repellents
      • Plant protection products
        • Glyphosate
    • Online shopping
      • At your own risk
    • If a service poses a hazard or risk
    • If a product poses a risk
    • Home technology and electricity
      • Do-it-yourself electrical work
      • Electric vehicle batteries and charging
    • Plans for opening a mine near my neighbourhood are in the works. What can I do?
    • Property in the neighbourhood of a factory
  • Chemicals
    • CLP
      • Submitting information on hazardous mixtures to poison centres
      • Operators and obligations
    • Hazard pictograms for chemicals
    • REACH
      • Safety data sheet
      • Operators and obligations
    • Biocides
      • Biocidal active substances
      • Authorisation of biocidal products
      • National authorisation conditions for biocidal products
        • Authorisation conditions for biocidal antifouling products used on boats
      • Treated articles
      • Safe and sustainable use of biocides
        • User categories
        • Restrictions on the use of arsenic
        • Restrictions on the use of creosote
        • Restrictions on the use of treated wood
        • Restrictions on the use of insecticides
        • Rodenticides
        • Sustainable and safe use of biocidal antifouling products for boats
      • Transitional period
      • Pest control
      • Chemical lists and registers
      • Other obligations concerning biocidal products
      • Non-included products and their removal from the market
      • Fees
    • Plant protection products
      • Authorised products
        • Plant Protection Product Register
      • Plant protection training and certification
        • Application to become a plant protection training and certification provider
      • Inspection of plant protection application equipment
        • Application to become an inspector of application equipment
      • Safe use of plant protection products
        • Integrated pest management
        • Storage and disposal
        • Products for professional and consumer use
        • Reducing health risks
        • Reducing environmental risks
        • National Action Plan for the Sustainable Use of Plant Protection Products
          • National Action Plan on Sustainable Plant Protection III 2023–2027
        • Harmonised risk indicators
      • Applying for approval for a new product
        • Authorisation based on zonal assessment
        • Mutual recognition
        • Comparative assessment
        • Parallel trade permit
      • Renewal and amendments of an authorisation
        • Renewal of authorisation
        • Extension of use and extension of product authorisation for minor use
        • Other changes concerning an authorisation
      • Derogations and trials
      • Risk assessment and approval of active substances
        • Equivalency assessment of active substances
      • Maximum residue level (MRL)
      • Classification and labelling
      • Sales volumes
      • Environmental restrictions
        • Water body restrictions
        • Groundwater restrictions
        • Restriction on repeated use
        • Protection of pollinators, beneficial organisms and mammals
        • Recommendation for protecting vegetation outside the spraying zone
    • Submitting information on chemicals
      • Reporting quantitative information
    • Retail of chemicals
    • Architectural paints and varnishes
      • Exemption
    • Cosmetics
      • Which products are ‘cosmetic products’?
      • Composition and safety of cosmetic products
      • Know your role
        • Obligations of the responsible person
        • Distributor's obligations
        • Summary of obligations of the responsible person and the distributor
      • Labelling of cosmetics
      • Warning labels for hair dyes
      • Marketing claims related to cosmetics
        • Animal testing related to cosmetics
      • Reporting serious undesirable effects (SUE) caused by cosmetics
    • Mercury
    • Persistent Organic Pollutants (POP)
    • Detergents
  • Electricity
    • Electrical works and contracting
      • Duties of Supervisors of Electrical Works
      • Commissioning Stage Inspections of Electrical Installations
      • Basic Principles of Electrical Safety
        • First Aid in Electrical Accidents
          • How to prevent electrical accidents
        • Safety Near Electrical Wiring
      • Technical Requirements for Electrical Installations
        • Old Regulations
      • Electrical Qualifications and their Scope
      • Changes and Termination of Business
    • Electrical works in Finland
    • Inspection activities
    • Electrical installations
      • Design
      • Installation, commissioning and changes
      • Possessor of the electrical installation and the operation manager
      • Taking out of service
      • Maintenance
      • Periodic inspections
  • Products and services
    • Electrical products
      • Electrical safety – LVD
      • Electromagnetic compatibility – EMC
      • Hazardous substances in electrical and electronic equipment – RoHS
      • ATEX - equipment for potentially explosive atmospheres
      • Waste Electrical and Electronic Equipment – WEEE
      • Batteries and accumulators
      • Ecodesign
      • Energy labelling
    • Packaging and packaging waste
    • Lifts
      • Lift user
      • The possessor of the lift
      • Performance of lift work
      • Lift inspections
      • Modernisation
      • Conformity with the applicable requirements
    • Measuring instruments
      • Use of measuring instruments
        • Use a measuring instrument compliant with the requirements
        • In-service verification must usually be performed regularly on measuring instruments
        • Moving a measuring instrument to another place of use
        • Inspection bodies verify measuring instruments
        • Verification after maintenance and maintenance seals
        • Detailed verification instructions
      • Markings on measuring instruments
      • Scales
        • The conformity of scales
        • In-service verification of scales
        • Retail scales
        • Use tare in selling bulk products
        • Weighing in industry
        • Scales intended for weighing precious metals
      • Liquid fuel measuring systems
        • Requirements on liquid fuel measuring systems
        • In-service verification of measuring systems
        • Combining measuring systems with accessories with national type approval
        • Liquid loading systems
      • Utility meters
        • Water meters
      • Measuring the energy charged in electric vehicles
      • Packaged products
        • E-marking on pre-packaged products
      • Measuring alcoholic drinks in restaurants
      • Measurements at open-air marketplaces
      • Demonstrating the compliance of measuring instruments
      • International cooperation
    • EU Safety Gate system for dangerous products
    • Dangerous products
      • Notifying Tukes of dangerous or non-compliant products
      • Notifying via the EU Business Gateway system
      • Announcing product recalls
    • Products’ compliance with requirements
      • The role of standards in demonstrating conformity to requirements
      • EU Declaration of Conformity
      • Deficiencies in documents issued by notified bodies to demonstrate product conformity
      • Traceability of products
      • Operating instructions and markings regarding the safe use of products
    • Personal protective equipment
      • Transitional periods
      • Risk categories
      • Reflective products
      • Dry suits and wet suits
      • Personal protective equipment manufactured for military purposes
    • Articles of precious metals, jewellery and watches
      • Marks on articles of precious metals
        • Date mark index
        • Other marks
      • How to apply for a responsibility mark and a locality mark from Tukes
        • How to apply for a responsibility mark
        • Confirmation of responsibility mark registration
        • Termination of responsibility mark registration
        • How to transfer a responsibility mark from one company to another
        • Changing contact information in the responsibility mark
        • How to apply for a locality mark
      • Fineness, solders, filling and coatings
        • When is a product description required for an article of precious metal?
      • Products with several materials
      • Chemicals in jewellery and watches
      • Recycling and repair
    • Machinery
      • Manufacturer of the machinery
      • Manufacturer's authorised representative
      • Other EU legislation potentially applying to machinery
      • Importer or distributor of the machinery
      • Electric personal transportation devices
    • Gas appliances
    • CE marking
    • Refrigeration
      • Refrigeration equipment companies and refrigeration contracting
      • Qualification of personnel and qualification requirements
      • Providers of refrigeration fitters' qualification tests authorised by Tukes
      • Providers of education/training and qualifications in the field of refrigeration
      • Applying for authorisation as a provider of qualification tests in the field of refrigeration
    • Fire safety equipment
      • Smoke alarms
      • Carbon monoxide alarms
      • Portable fire extinguishers
        • Portable fire extinguishers marketed for lithium-ion battery fires
      • Fire extinguishing systems
      • Fire alarm systems
      • Smoke exhaust systems
      • Prefabricated fireplaces
      • Exit signs and emergency escape lighting
    • Importer's obligations
    • Distributor's obligations
    • Manufacturer’s obligations
    • Approved companies
    • Pressure equipment
    • General consumer goods
      • Responsibility for product safety
      • Product safety assessment
      • Technical documentation
      • Requirements on indoor candles
      • Air, paintball and plastic pellet guns
      • Disposable barbecues
      • Ventless fireplaces
      • Domestic swimming pools and outdoor hot tubs
      • Safety of furniture
      • Roller and other blinds
      • Textiles
        • Cords and drawstrings on children’s clothing
      • Safety of ladders
      • Safety of child care articles
        • Soother holders and soothers
      • Lighters
      • Outdoor candles
    • Toys
      • Manufacturer, authorised representative, importer, distributor
      • Legislation on toys
      • Technical documentation and risk assessment
      • Markings on toys
      • Small parts in toys and other products for children
      • Most commonly detected defects in toys
      • Product-group-specific instructions and requirements
    • The obligations of economic operators as a table
    • Construction products
      • CE marked construction products
        • Production of CE marked construction products
        • Selling CE marked construction products
      • Other construction products
      • Use of a construction product
      • Frequently asked questions about construction products
      • Product Contact Point for Construction
    • Single-use plastics (SUP)
    • Hazardous substances in vehicles (ELV)
    • Safety in leisure services
      • Service provider obligations
        • Hazard identification and risk assessment
        • Planning and delivery of the service
        • Risk-based approach and continuous improvement
        • Reporting accidents and near misses
  • Industry
    • Transport of dangerous goods
      • Safety of transport of dangerous goods
      • Dangerous goods classes
      • Markings and warning labels in transport of dangerous goods
      • Conformity of tanks and packaging
      • Packaging and marking examples
      • Gas cylinders
        • LPG cylinders
      • Inspection bodies of transport of dangerous goods
      • Accident reporting in case of on accident during transport of dangerous goods
        • TDG accidents
      • Transporting fuel as parcelled goods
      • Abnormal procedure approved by Tukes
      • Consumers and transporting dangerous goods
      • New legislation on the transport of dangerous goods
    • Mining, ore prospecting and gold panning
      • Mining
        • Mining safety permit
      • Exploration
      • Gold panning
        • How to apply for a gold panning permit
        • Once you have received a gold panning permit
      • Map files
    • Chemical establishments
      • Finding out whether the operations require a permit
      • Processing of permits and changes
      • Changes to the production plant
      • Operation and management of the facility
      • Inspections
        • Commissioning inspections
        • Periodic inspections
        • Remote inspection and inspection of the corporate group
      • Process safety system
        • Organisation and personnel
        • Process risk assessment and management
        • Operation and maintenance
        • Change management
        • Planning for emergencies
        • Performance monitoring
        • Audits and reviews
        • Addressing the requirements at new production plants and in the permit process
    • Inspection bodies
    • Land-use planning
    • Natural gas and biogas
      • Biogas
      • Applying for a construction licence and notifications
      • Natural gas and biogas filling stations
      • Natural gas storage
      • Operations supervisor
      • Installation, inspection and operating permit
    • Roles of the actors
    • Potentially explosive atmospheres
      • ATEX - equipment for potentially explosive atmospheres
    • Chemical piping
    • Chemical tanks
    • LPG plants
    • Conflict minerals
    • Cybersecurity
      • Registration with the operator list
  • Online services
    • Forms
      • Articles of precious metals
      • Biocides
      • Electrical and lift works
      • Plant protection products
      • Products and services
    • Report serious accidents at plants or mines
    • Tukes’s exams
      • Electrical safety certification
    • Report a dangerous or defective product
    • Ask questions or provide feedback
    • REACH, CLP and biocides helpdesk
    • Product contact point
      • Product regulation at the EU level
      • General requirements for products in Finland
      • National product regulations
      • Mutual recognition of goods in the EU
      • Appeals, SOLVIT and complaints
    • Fees
  • About us
    • This is Tukes
      • Organisation
      • Management team
      • Strategy, vision and values
      • Operating principles
      • The History of Tukes
      • Procurement and invitations to tender
    • Work at Tukes
      • Vacancies
    • What's new
      • Lifecycle of lithium-ion batteries
    • Accidents
    • Contact details
    • Subscriptions
    • Data protection at Tukes
      • Personal data registers
    • Map files
    • About website
    • Accessibility statement
  • Contact Details
Back to top